Amendment 1 updates section 7.3.6.3 following RSS-Gen Issue 6. The current text specifies that clients without radar detection only need to satisfy the channel move time and channel closing transmission time requirements in that section.
The broader removal of the 5600-5650 MHz operating restriction and changes to hybrid systems, TPC and vehicle use belong to Issue 4 dated 24 July 2025. Operation in 5600-5650 MHz remains subject to DFS and the ETSI EN 301 893 test procedure under section 7.3.6.1.
Impact
Impact assessment: Low.
Key reasons: Published standard amendment; distinguish the 2026 amendment from the 2025 Issue 4 changes. Amendment 1 updates section 7.3.6.3 following RSS-Gen Issue 6. The current text specifies that clients without radar detection only need to satisfy the channel move time and channel closing transmission time requirements in that section.
Who is affected?
Radio-equipment manufacturers and importers, certification bodies, test laboratories, Canadian representatives and compliance teams responsible for devices using the affected DFS bands.
Conclusion:
Review the update, document its applicability to current products and processes, and continue monitoring for any binding technical or procedural changes.
Regulatory Authority
Innovation, Science and Economic Development Canada (ISED)
Regulatory Impact
| Impact Type | Status |
|---|---|
| Top Priority | |
| Type Certificate | |
| Spectrum Bands | |
| Import Changes (HS Codes) | |
| Standard Changes | |
| Product Changes | |
| Label Changes |