ISED opened consultation on draft RSS-199, Issue 5, which retains the certification framework for Broadband Radio Service equipment in 2500-2690 MHz and adds an alternative unpaired-only band plan for TDD equipment. The proposed plan divides the entire band into 38 unpaired 5 MHz blocks that may be aggregated.
Base station, fixed station and subscriber equipment remain Category I apparatus requiring certification and compliance with RSS-Gen. The existing paired and centre-gap arrangements are retained.
Comments are due December 4, 2026. The draft is not yet binding; after final publication, a six-month transition would permit applications under either Issue 4 or Issue 5 before Issue 5 becomes the sole route.
Impact Impact assessment: Low.
Key reasons: Canada is consulting on RSS-199 Issue 5 for 2500-2690 MHz BRS equipment. The key proposal is a TDD-only plan of 38 unpaired 5 MHz blocks across the full band.
Who is affected? Telecommunications-equipment manufacturers, Brazilian importers and representatives, OCD certification bodies, test laboratories and teams using ANATEL's CERTIFICA procedures.
Conclusion: Review the proposal against current products and procedures, assess technical and documentation gaps, and monitor the authority for the final text before treating the draft as binding.
Regulatory Authority
Innovation, Science and Economic Development Canada (ISED), Directorate of Regulatory Standards
Regulatory Impact
| Impact Type | Status |
|---|---|
| Top Priority | |
| Type Certificate | |
| Spectrum Bands | |
| Import Changes (HS Codes) | |
| Standard Changes | |
| Product Changes | |
| Label Changes |