ISED is consulting on SRSP-517 Issue 3, which sets minimum technical requirements for efficient use of the 2500-2690 MHz band by Broadband Radio Service systems. The draft reflects the revised band-plan decision and introduces technical planning for an additional unpaired time-division-duplex arrangement while maintaining the existing framework during transition. It concerns deployment, coordination and spectrum engineering; equipment certification requirements remain addressed separately through RSS-199.
Impact Impact assessment: Low.
Key reasons: The draft can affect network design, coordination and deployment planning in the 2500-2690 MHz band, although it is not itself the equipment certification specification.
Who is affected? Manufacturers, importers, network operators, test laboratories, certification bodies and regulatory compliance teams responsible for the covered products, systems or activities.
Conclusion: Compare planned deployments with the proposed Issue 3 parameters and coordinate comments before December 4, while continuing to use the current SRSP and RSS-199 requirements.
Regulatory Authority
Innovation, Science and Economic Development Canada (ISED)
Regulatory Impact
| Impact Type | Status |
|---|---|
| Top Priority | |
| Type Certificate | |
| Spectrum Bands | |
| Import Changes (HS Codes) | |
| Standard Changes | |
| Product Changes | |
| Label Changes |